|
Plant & Processing Equipment to include, Air Compressor Rooms, Spring Water Delivery & Storage, 200,000 ltr Tanks, Pump & Filter Systems, Freestanding Dual Carriage Gantry System, Complete Oil Store Pumping & Measure, Juice Tanker Pump, Multiple Pressure Pumps, Motors, Flammable & Chemical Cabinets, Racking, Hand Railing, Transportable Buildings, Open Plan, Shower Toilet etc, Stainless Steel Benching, Racks, Platforms, Access Stairs, Parts, Laboratory Equip & More
LATE NOTICE,
BOILERS AND REFRIGERANT CHILLERS ARE WITHDRAWN AND WILL BE SOLD AT A LATER DATE .
NOTES:
Dismantling and Removal is the buyers Responsibility, MGS and CCA will be utilizing a safe work policy with all contractors to be inducted onsite with white cards and the correct equipment for removal.
Plant Allocated Removal Times:
Plant that is subject to removal times will be notified in the final catalogue listing prior to sale, For instance a compressor might be required to stay onsite till a certain fixture has been removed.
MGS & CCA are Prepared to work with the buyer"s regarding removal, however all associated costs are the responsibility of the buyer.
Minor Plant Removal:
As in part 1, there will be an entry access and exit system operating for collection, please follow the directions from staff when collecting.
|