|
Boilers, 220KVA Genset, Dryers, Cooling Towers, Cafeteria, F/Glass Tanks, Pumps, Water Treatment, S/ Steel 2-4500 ltr Tanks, Pipe, Valves, Motors, Electronics, 6&3 Mtr Office's, Materials Handling, Recycling Loaders, S/Steel Conveyor sections, Transfer Stations, Bottling Plant, Lift & Load Gantry, Access Platforms, Access Steps, Railings, Storage, Flammables Cabinets & More.
NOTES:
Dismantling and Removal is the buyers Responsibility, MGS and CCA will be utilizing a safe work policy with all contractors to be inducted onsite with white cards and the correct equipment for removal.
Plant Allocated Removal Times:
Plant that is subject to removal times will be notified in the final catalogue listing prior to sale, For instance a compressor might be required to stay onsite till a certain fixture has been removed.
MGS & CCA are Prepared to work with the buyer's regarding removal, however all associated costs are the responsibility of the buyer.
Minor Plant Removal:
There will be an entry access and exit system operating for collection, please follow the directions from staff when collecting.
|